South Greensboro Area Plan - Public Review Draft - 9.25.25
Walmart/Lowes Shopping Center
8
» Deal with crime and safety issues » Enhance pedestrian connectivity (use entire block as case study for increasing pedestrian connectivity requirements and standards for commercial and multifamily residential development overall) » Require interconnectivity for development sites, including the use stub streets and sidewalks » Require sidewalk connections to thoroughfares » Prohibit stormwater ponds from being placed in frontage areas without also serving as an amenity » Prohibit loading areas and waste enclosures from being located in a frontage zone or along a roadway
» Prohibit the mixing of loading areas with customer driveway locations » Require sidewalks on all new streets (at least on one side) and for sidewalks to connect with one another » Prohibit or avoid “dog leg” intersections connecting development sites » Prohibit curb ramps that “dump” users into drive aisles » Require crosswalks » Require the front entrances of buildings to be connected to the public sidewalk system in the most direct manner possible
Old Treybrooke Dr
W Elmsley Dr
8 Draft
S Elm-Eugene St
248 / SOUTH GREENSBORO AREA PLAN
APPENDIX
PUBLIC REVIEW DRAFT - 9/25/25
Made with FlippingBook flipbook maker