South Greensboro Area Plan - Public Review Draft - 9.25.25
Consider shared use path to connect to Sussman Park, Southeast Greenway, and Downtown Greenway (design and side of street to be determined)
Consider alternate greenway alignment to cross at intersection
I-40
Opportunity for pubic art, wayfinding, or gateway treatment
Creek Ridge Rd
Connect bike lanes and commercial node to recommended greenway via potential shared use path
Consider stream restoration, linear park
Creek Ridge
Creek Ridge Rd
US 29
Ryan Creek
Legend
Randleman Rd
0 100 200
400 feet
Existing Greenway Planned Greenway Parks & Open Space Planned Bike Lane Bike Lane Existing Sidewalk Planned Sidewalk
Publicly-Owned Property
Potential crossing
Flood Prone Areas
Potential Park Entrance Pedestrian Crossing Improvements Potential Pedestrian Bridge
Creekridge Valley
Connection opportunities
To Greenhaven Park
Long St
Parks and Open Space Analysis: Ryan Creek at Randleman Road (Source: Bolton & Menk)
Ryan Creek at Randleman Road 3
Draft
This area is a key piece of the open space system and planned greenway network. Given that much of this area is within a floodplain, a feasibility study is needed to more clearly identify installation and maintenance costs. However, this network expansion has the potential to be a key connector between Greenhaven, Shannon Woods and Shannon Hills parks to planned activity centers along Randleman Road. This area also has the potential to unify future parks and open spaces along Ryan Creek, especially where it merges with Buffalo Creek to the northeast. Finally, a new shared use path along Randleman Road from Creek Ridge Road north to Florida Street and the Southeast Greenway would connect south Greensboro to Downtown by a continuous network of off-street paths.
Opportunities: » Consider flood mitigation and/or stream restoration of Ryan Creek near Randleman Road and north of Creek Ridge Road; leverage this opportunity to create a linear open space on public property north of Creek Ridge Road. » Extend the existing greenway along Ryan Creek northeast from its current terminus at Greenhaven Park to connect to Randleman Road and existing bike lanes on Creek Ridge Road. » Create a shared use path alongside Randleman Road from the Creek Ridge Road intersection north to Florida Street and the Southeast Greenway, which connects directly to downtown.
SOUTH GREENSBORO AREA PLAN / 83
ENVIRONMENT, PARKS, AND OPEN SPACE
PUBLIC REVIEW DRAFT - 9/25/25