Schedule of External User Fees for Year 14-15

Water and Sewer Connections 1 Size/Type

Fee 2

5/8” x 3/4” Water 3/4” x 3/4” Water

$1,100 $1,150

1” Water

Per Cost Per Cost Per Cost Per Cost Per Cost Per Cost Per Cost

1 1/2” Water

2” Water 3” Water 4” Water 6” Water 8” Water

5/8” x 3/4” Add On 3/4” x 3/4” Add On

$470 $510

1” Add On

Per Cost Per Cost Per Cost

1 1/2” Add On

2” Add On

Set 5/8”

$165 $185 $200 $235 $310 $385

Set 5/8” (New Construction)

Set 3/4”

Set 1”

Set 1 1/2”

Set 2” Set 3” Set 4” Set 6” Set 8”

Per Cost Per Cost Per Cost Per Cost

4” Sewer 6” Sewer 8” Sewer

$1,050

Per Cost Per Cost Per Cost Per Cost

8” x 4” Saddle 8” x 6” Saddle

Adjust Hydrant 10’ Hydrant to Main

Per Cost Per Cost

Inspections and Special Testing Test Type

Fee $50

Hydrant Flow Test Extra Service Trip

$60 per trip

Application and Cut-On Fee

$15

Special Meter Test at Customer’s Request

Fee $60 $60 $60 $90 $90

5/8” 3/4”

1”

1 1/4” 1 1/2”

2” 3”

$120 $150

1 Fees do not include the cost of pavement cuts which will be assessed at a rate of $575 per job (standard street); $250.00 additional fee for request to raise a sewer lateral in order to connect to a residential sewer line. 2 Deduct $100.00 off total proposed fee if water and sewer installed in same ditch.

City of Greensboro External User Fee Schedule FY 2013-2014

Page | 35

Made with