FINAL ADOPTED BUDGET 2020-2021
FIRE DEPARTMENT
Efficiency Measures Percentage of first due unit arrival in six minutes or less (medical) Percentage of first due unit arrival in six minutes 20 seconds or less (fires) Percentage of cardiac arrest patients that regain a pulse before being turned over to a higher level of medical care Percentage of compliance with the state mandated minimum inspection frequency for all occupancies Percent of when 9-1-1 call processing was 60 seconds or less (Metro 911 function) (Moderate Fire Hazard) Percent where turn out time was 80 seconds or less(Moderate Fire Hazard) Percent where travel time for first arriving unit was four minutes or less (Moderate Fire Hazard) Percent where 17 persons arrived on scene in 11 minutes 35 seconds or less (Moderate Fire Hazard) Percent where entire first alarm complement arrived in 10 minutes 20 sec or less(Moderate Fire Hazard) Effectiveness Measures Percentage of actual residential structure fires that are contained to the room of origin Percentage of total number of fires that were commercial structures Percentage of total dollar loss that were commercial structures Percentage of dollar loss based on total value of commercial property where fires occurred Percent of property value saved by fire protection services
68.00% 85.00%
68.40% 85.30%
70.00% 90.00%
68.00% 85.00%
26.00%
26.42%
25.00%
26.00%
17.00%
17.02%
40.00%
17.00%
83.00%
82.55%
90.00%
83.00%
37.00%
36.70%
50.00%
37.00%
92.00%
91.70%
90.00%
92.00%
96.00%
96.10%
95.00%
96.00%
86.00%
86.14%
92.00%
86.00%
71.00%
70.91%
70.00%
71.00%
22.00% 24.00% 1.00%
22.16% 23.70% 1.14%
20.00% 3.00% 1.00%
22.00% 24.00% 1.00%
97.00%
96.63%
95.00%
97.00%
Budget Highlights:
The FY 20-21 Adopted Budget is increasing by $649,773, or 1.2%. The budget includes the delay of the Fall Fire academy by three months, with a start date of October 1, 2020; as well as a hiring delay of the department's Public Safety Community Relations Specialist position; and a reduction of $5,000 in Maintenance & Operations. These operating changes will reduce operating expenses by $373,821 to address projected revenue shortfalls due to COVID-19. Fire Stations #7 (Gatewood Avenue) and #56 (Franklin Boulevard) are under construction and will be replaced over the next two years as the Fire Department begins a multi-year effort to replace and improve aging fire stations.
Adopted 2020-21 Budget
131
Made with FlippingBook Learn more on our blog