2023 Parks and Recreation Aquatics Master Plan
Aquatic Facilities Master Plan FACILITY AUDIT
3
PEELER RECREATION CENTER Overview Peeler - Annie Williams Pool › 25m x 25m L-shaped lap pool. Actual pool volume and data were not provided. The lap pool was covered at the time of this visit. The pool shell evaluation is limited. › The pool has remained unused for some time. Aquatic vegetation was growing on top of the winter cover.
Surge Tank Access › The surge tank is located in the mechanical room. The water present is stagnant and has a strong odor.
Fresh Water Fill › For reference - not evaluated.
Submerged Drains › Not observed - the pool was covered and full at the time of this visit.
Surface Gutters and Pool Water Return › The lap pool has a tile and surge-style gutter system. Limited exposed areas of the plaster finish show signs of cracking and deterioration and appear to be in poor condition.
Depth Markers and No Diving Markers › Not evaluated.
Pool Deck and Enclosures › Pool fencing is present but not evaluated.
Lap Pool Equipment Room Filtration System › A single filter pump was present. Data plates were not present. › A single tank high rate sand filter is present. The data plate was unreadable. Evidence of long-term tank leaks is evident. Chemical Systems › The pool uses an erosion-style trichlor feeder and manual addition of acid for pH control. No automated chemical controllers are present. › Unused chemicals should be stored properly.
73
Made with FlippingBook Ebook Creator