2023 Parks and Recreation Aquatics Master Plan
City of Greensboro RECOMMENDATIONS
5
Bike Rack (6 -bike ) 2
4.0 sets
$500.00
$ 2,000.00 $371,420.00 $18,571.00 $389,991.00 $10,919.75 $38,999.10 $7,799.82 $38,999.10 $486,708.77 $73,006.32 $559,715.08 $268,663.24 $ 828,378.32
Subtotal
General Requirement, 5% 3
Subtotal
Sales tax, 7% 1
Construction Contingency, 10% 3
Bonds, Insurance, 2% 3 Design Contingency, 10% 3
Subtotal
GC Overhead/profit, 15% 3
Subtotal
Escalation, 6% / yr x 8 yrs. = 1.48
Total Project Construction =
1. Sales tax on materials only, not labor. Assume labor equates to about 40% of total costs 2. Assumed structures without a conceptual design 3. Assumed percentages. 4. Assumed construction to start in Fiscal Year 2032. 5. Painting allowance.
Additional Sites Opinion of Probable Cost The following estimates are based on high-level, desktop review of site conditions and preliminary programming. Further studies are needed for master plan-level opinion of cost.
GRIFFIN COMMUNITY PARK
Quantity Units
Unit Cost ($)
Total Cost
PHASE 1 Aquatics Facility
1.0 ls
$4,000,000.00
$ 4,000,000.00
Structures Shelter
1.0 ea 1.0 sf
$50,000.00
$ 50,000.00
Restroom/Bathhouse Site Pedestrian Pathways Resurface Parking lot
$450.00
$ 2,700,000.00
3000.0 sf 4000.0 sf 500.0 lf
$6.00 $5.00
$ 18,000.00 $ 20,000.00 $ 25,000.00 $ 1,000.00 $ 5,000.00
New Curb/Gutter
$50.00
Park Signage Landscaping
1.0 ls 1.0 ls
$1,000.00 $5,000.00
Exterior Seating Seating, inground ea
10.0
$2,900.00
$29,000.00
Gathering Spaces Storm Water Management Facility
1.0 ls 2.0 ea 12.0 ea
$20,000.00 $15,000.00 $1,200.00
$20,000.00 $30,000.00 $14,400.00
Shelters
Picnic tables 2
104